MI Inspectors Find Local Inspection Services

Best Well Installation in Midland, MI

Compare 7 local well installation providers in Midland, MI. Verified listings with real contact info.

7 verified providers · Updated 2026-04-25

Quick Compare

1

Dan's Well Drilling

4.4 ★ (18 reviews)

Call
2

B & B Well Drilling

4.8 ★ (11 reviews)

Call
3

Thayer Well Drilling

3.5 ★ (31 reviews)

Call
1

Dan's Well Drilling

4.4 (18 reviews)
1221 9 Mile Rd, Kawkawlin, MI 48631
2

B & B Well Drilling

4.8 (11 reviews)
128 N Huron Rd, Linwood, MI 48634
Mon–Fri 9am–5pm · Sat–Sun Closed
3

Thayer Well Drilling

3.5 (31 reviews)
3481 M-30, Beaverton, MI 48612
Mon–Sat 8am–5pm · Sun Closed
4

Gates Drilling & Services

4.1 (17 reviews)
9854 E Broomfield Rd, Mt Pleasant, MI 48858
5

Brad Malley Well Drilling Inc

4.4 (57 reviews)
1565 Park Pl, Mt Pleasant, MI 48858
Mon–Fri 8am–5pm · Sat–Sun Closed
6

Chad Malley Well Drilling

4.7 (50 reviews)
2626 E Weidman Rd, Rosebush, MI 48878
Mon–Fri 8am–5pm · Sat–Sun Closed
7

Meihls Well Drilling

4.4 (51 reviews)
2575 Demura Rd, Sterling, MI 48659
Mon–Fri 8am–5pm · Sat–Sun Closed

Frequently Asked Questions

How much does a complete well installation cost in Michigan?

A complete well installation typically costs $12,000 to $25,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. Bedrock wells are at the higher end. State permitting requirements, mandatory water quality testing, and well completion reporting add to the total cost.

What's included in a complete well installation in Michigan?

A complete installation includes state-required permits, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and mandatory initial water quality testing per state code.

How long does it take to install a complete well system in Michigan?

The entire process typically takes 4-8 weeks from permit application to final approval. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing and electrical connections 1-2 days. Water testing results take 5-10 business days. EGLE and county health departments set permit and inspection timelines that vary by jurisdiction.

More Well Installation Nearby

Related Services in Midland

All services in Midland, MI →